Advice | Due to upgrades occuring at Moss Vale Train Station Lackery Rd will be closed on Thursday 5 December from 6am and 6pm between Garrett St and Parkes Rd while the upgrades take place. Traffic controllers will be on site to direct motorists. Detours will be in place |
Diversions | Light vehicles will be detoured via Parkes St. Heavy vehicles up to 12T will be detoured via Garret St. Heavey vehicles over 12T will be detoured via Innes Rd and Berrima Rd. |
Schedule | Closed Both directions Thursday - (6:00am - 6:00pm) |
Roads | Lackey Road, Garrett Street, Moss Vale, Parkes Road |
View more details
Location: (-34.5450848, 150.3726402)
Category | HAZARD, Landslide, Unplanned |
Advice | Check signage Exercise caution The road is open with caution. Flooding has caused land slips at several points on Meryla Road It is anticipated that repair works will commence in late 2023 or early 2024 |
Roads | Meryla Road, Yarrawa Road, Moss Vale |
Organisation | Wingecarribee Shire Council 02 4868 0888 mail@wsc.nsw.gov.au http://www.wsc.nsw.gov.au |
View more details
Location: (-34.5929922, 150.3949337)
Category | HAZARD, Landslide, Unplanned |
Advice | Check signage Exercise caution The road is open with caution. Flooding has caused road damage and embankment slips It is anticipated that repairs will commence in 2024 |
Roads | Wombeyan Caves Road, Joadja North Trail, High Range |
Organisation | Wingecarribee Shire Council 02 4868 0888 mail@wsc.nsw.gov.au http://www.wsc.nsw.gov.au |
View more details
Location: (-34.3433766, 150.2114958)
Category | EMERGENCY ROADWORK, null, Unplanned |
Advice | Exercise caution Reduce your speed Flood/Storm Damage Damage affects Spring Hills Rd and Brays Rd |
Roads | Spring Hills Road, Brays Road, Meryla |
Organisation | Wingecarribee Shire Council 02 4868 0888 mail@wsc.nsw.gov.au http://www.wsc.nsw.gov.au |
View more details
Location: (-34.6658456, 150.3800307)
Category | HAZARD, Road damage, Unplanned |
Advice | Use an alternative route Avoid the area Road destroyed by flooding Robinson St closed to all traffic where Robinson St crosses the creek. Alternate access via Nero St. |
Diversions | Use alternate route Access to Robinson Street addresses via Nero street |
Roads | Robinson St, Devon Street, Mittagong |
Organisation | Wingecarribee Shire Council 02 4868 0888 mail@wsc.nsw.gov.au http://www.wsc.nsw.gov.au |
View more details
Location: (-34.460731, 150.4511077)
Category | CHANGED TRAFFIC CONDITIONS, Unplanned, Unplanned |
Advice | Avoid the area Use an alternative route The road is closed to through traffic. Storms and floods have caused extensive road damage and embankment slips. The road is closed to visitors between Goodmans Ford and Langs Road, Wombeyan Caves. Access for residents living East of Wombeyan Caves is available although residents should drive with caution. Access for visitors to Wollondilly River Station campsite is available although visitors should drive with caution It is anticipated that repairs will commence in mid 2024 |
Diversions | |
Roads | Wombeyan Caves Road, Bowmans Hill Trail, Goodmans Ford, Langs Road |
Organisation | Wingecarribee Shire Council 02 4868 0888 mail@wsc.nsw.gov.au http://www.wsc.nsw.gov.au |
View more details
Location: (-34.3073791, 150.0661444)
Category | HAZARD, Road damage, Unplanned |
Advice | Exercise caution Use an alternative route |
Roads | Nandi Road, Hawkshill Road, Canyonleigh |
Organisation | Wingecarribee Shire Council 02 4868 0888 mail@wsc.nsw.gov.au http://www.wsc.nsw.gov.au |
View more details
Location: (-34.5202423, 150.1252907)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Use an alternative route Check signage Roadworks commence 1 July 2024 with completion estimated to be December 2024, weather permitting. A section of the road will be closed between Etheridge Street and Cavendish Street and signs for detours will be placed around the area, from Monday 1 July 2024. When travelling near the work zones, road users and pedestrians are advised to exercise care and adhere to the altered traffic conditions. Exercise caution in the presence of heavy machinery and construction workers in the area. |
Diversions | Detour in place. Traffic Management Plan in place. |
Schedule | Closed Both directions Every Day - (all day - ) |
Roads | Priestley Street, Mittagong |
Organisation | Wingecarribee Shire Council 02 4868 0888 mail@wsc.nsw.gov.au http://www.wsc.nsw.gov.au |
View more details
Location: (-34.4501097, 150.4352446)
Category | CHANGED TRAFFIC CONDITIONS, due to an earlier incident, Unplanned |
Advice | Expect delays Reduced speed limit Wastewater Rising Main Break |
Speed Limit | 40 |
Roads | Colo Street, Range Road, Mittagong |
Organisation | Wingecarribee Shire Council 02 4868 0888 mail@wsc.nsw.gov.au http://www.wsc.nsw.gov.au |
View more details
Location: (-34.4505419, 150.4564064)
Category | SCHEDULED ROADWORK, Resurfacing, Planned |
Advice | Allow extra travel time Check signage Road Repair Works Roads and footpaths will be under traffic control. Traffic controllers will guide traffic around the worksite. Road users are cautioned to follow the changed traffic conditions, exercise care when travelling near the work zone and be aware of heavy machinery. |
Schedule | Affected Both directions Weekdays - (7:30am - 4:00pm) |
Roads | Belanglo Road, Cherry Tree Road, Belanglo |
Organisation | Wingecarribee Shire Council 02 4868 0888 mail@wsc.nsw.gov.au http://www.wsc.nsw.gov.au |
View more details
Location: (-34.531135, 150.260008)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Allow extra travel time Check signage Road Drainage Construction Works Roads and footpaths will be under traffic control. Some sections of road will be closed. Traffic controllers will guide local resident traffic around the worksite. Road users are cautioned to follow the changed traffic conditions, exercise care when travelling near the work zone and be aware of heavy machinery. |
Diversions | Closed to all through traffic Local resident and bus access only |
Schedule | Closed Both directions Every Day - (7:30am - 4:00pm) |
Roads | Sunninghill Avenue, Eridge Park Road, Burradoo, Burradoo Road |
Organisation | Wingecarribee Shire Council 02 4868 0888 mail@wsc.nsw.gov.au http://www.wsc.nsw.gov.au |
View more details
Location: (-34.501518, 150.42752)
Category | SCHEDULED ROADWORK, null, Planned |
Advice | Check signage Exercise caution Roadworks in progress Roads and footpaths will be under traffic control. Traffic controllers will guide traffic around the worksite. Road users are cautioned to follow the changed traffic conditions, exercise care when travelling near the work zone and be aware of heavy machinery. |
Schedule | Affected Westbound Weekdays - (7:30am - 4:00pm) |
Roads | Penrose Road, Penrose Railway Station, Penrose |
Organisation | Wingecarribee Shire Council 02 4868 0888 mail@wsc.nsw.gov.au http://www.wsc.nsw.gov.au |
View more details
Location: (-34.6724742, 150.2123494)
Category | HAZARD, Road damage, Unplanned |
Advice | Plan your journey Use an alternative route This road is not suitable for small, large or vehicles towing caravans. This section of Oldbury Road should be used by local traffic only. |
Roads | Oldbury Road, Sutton Forest |
Organisation | Wingecarribee Shire Council 02 4868 0888 mail@wsc.nsw.gov.au http://www.wsc.nsw.gov.au |
View more details
Location: (-34.5296388, 150.3057007)
No Traffic Cameras to display
Date: Wednesday 9/02/2022 & Thursday 10/02/2022
Location: Bowral Sewer Treatment Plant (STP), Burradoo Rd, Burradoo.
Notes: Council will be undertaking routine dewatering activities at Bowral STP (off Burradoo Rd, Bowral). There will be an increased risk of odours during the start-up of operations. There is be increased truck movements out of the STP during this time.
Updated: 08/02/2022 at 9:55am
Location: (-34.4934352, 150.3969955)
Date: TBC
Location: Moss Vale Sewage Treatment Plant, Kennedy Close Moss Vale
Notes: There is an increase risk of odour during this period however council will minimise any impacts as much as possible. There will also be increased truck movements in and out of the plant. We apologise for any inconvenience.
Updated: 5/11/2021 3:30pm
Location: (-34.5427888, 150.3569038)
Works: Water Pressure Improvement
Location: Queen St, Gladstone Rd, Carlisle St, Bowral and possible surrounding streets.
Notes: As part of Council’s commitment to providing a high level of service to the community, we are pleased to announce that network upgrades have recently been made to the water reticulation in this area. The result of this change will be a permanent and significant elevation of water pressure. The change will be noticed from 22/09/21.
Please be assured that the new pressure load is well within the design pressure of standard domestic plumbing.
Updated: 22/09/2021 at 8:30am.
Location: (-34.4755048, 150.4300583)
Date: Monday 14th February 2022
Estimated Duration: 01:18pm – 4:30pm
Location of Works: 3 Wheen Close, Bowral
Impact Area: Wheen Close and Westwood Drive, Bowral
Notes: No notifications have been distributed to residents due to the urgency of the matter.
Location: (-34.4904405, 150.4264867)
Date: Monday 14th February 2022
Estimated Duration: 02:00pm – 4:30pm
Location of Works: 6 Sackville Street, Hill Top.
Impact Area: Sackville, Pirrillie & Cumberteen Streets, Hill Top.
Notes: No notifications have been distributed to residents due to the urgency of the matter.
Location: (-34.3586281, 150.4870835)
Dates: April to August 2021
Location: Oxley Drive Reservoir, Bowral
Impact: No water supply impact
Notes on Project: The Oxley Drive Concrete Reservoir is 70 years old, and is still an important component in the Shire drinking water supply network. It will be emptied in April 2021 in preparation for extensive refurbishment during the winter. During this time the adjacent Oxley Drive Steel Reservoir will service the demand of the network. Residents will not be without water as a result of the works. The work is expected to be completed by mid-August, well in advance of the increased summertime water demand.
Updated: 20/04/2021 11:30am
Location: (-34.4739283, 150.4300234)
Date: 10 January 2022 to June 2022
Estimated Duration: 7:00 am to 5:00 pm Monday to Friday
Location: Kirkham Street Moss Vale
Impacted area: Properties and roadway on Kirkham Street
Updated: 7 January 2022 4:00pm
Location: (-34.5503402, 150.3726492)
Date: From 6th February 2022, expected to be completed by 3rd March 2022, weather permitting.
Estimated Duration: Works will be undertaken at night between the hours of 7:00pm and 4:00am Sunday to Thursday.
Location of Works: Moss Vale Central Business District.
Notes: Notifications have been letterboxed drop to residents on 20/01/2022.
Location: (-34.5489805, 150.3735601)
Date: Start 21 February 2022 to April 2022
Work times: 7:00am to 5:00pm Monday to Friday
Location: Wallangunda Street Robertson
Impacted area: Properties along Wallangunda Street, Burrawang Lane and Burrawang Street Robertson may be affected
Outage Impact: Water outages will be notified in advance when scheduled.
Other Impacts: Roadway access may be temporarily closed at Wallangunda Street – Hoddle Street intersection and the Wallangunda Street – Burrawang Lane intersection to facilitate under-boring the road.
Location: (-34.587152, 150.5892802)
Date: 28 February 2022 to May 2022
Work times: 7:00am to 5:00pm Monday to Friday
Location: Victoria Street Bundanoon
Impacted area: Properties along Victoria Street, Bundanoon may be affected
Outage Impact: Water outages will be notified in advanced when scheduled.
Other Impacts: Roadway access may be temporarily under traffic control conditions on Osborn Avenue and Victoria Street to facilitate under-boring the road.
Location: (-34.6569188, 150.3014462)
Flood Water over road, do not drive through or enter floodwater.
Until further notice
Closed at: Approximately 1km north east of Golden Vale Road
Detours: Access to all properties on Oldbury Road is still available. Addresses South West of Medway Rivulet – access from Golden Vale Road. Addresses north east of Medway Rivulet – access from Illawarra Highway.
Location: (-34.529629, 150.3056556)
43-49 Watson Road, Moss Vale
Earthworks, Regrading Parklands
Ongoing
A section of the Park leading off Watson Road to the top of the hill will be closed. The footpath and Road shoulder fronting the works will be closed. At times there will be a higher volume of truck movements, so road users and pedestrians are cautioned to follow the changed traffic condition, exercise care when travelling around the work zone.
Location: (-34.5426264, 150.3647635)
Flood damage.
Open to local traffic only, until further notice.
Barrallier Rd is closed at Goodmans Ford, to all traffic except local traffic due to flood and bushfire damage. Bushfire cleanup works are currently being undertaken. During the closure the road will be occupied by heavy trucks and plant. Residents accessing properties are advised to pay attention to conditions, beware of heavy plant and truck movements and drive with caution. Do not approach or attempt to pass any construction machinery.
Location: (-34.301127, 150.0702528)
Road repairs
Ongoing
Worksites in this section will be under traffic control. Sections of roads may be reduced to one-way traffic however the section will remain open to immediate residents. Road users are cautioned to follow the changed traffic conditions and exercise care when travelling through the work zone. Please note other sections of Wombeyan Caves Road west of Goodmans Ford are closed.
Location: (-34.345789, 150.1077157)
Rail Overbridge
Bridge Replacement and roundabout installation
March 2022
Transport for New South Wales (TfNSW) is undertaking bridge replacement and roundabout installation works on the Range Road Overbridge and adjacent intersection of Colo Street, Range Road and Railway Parade, as part of the NSW Government’s infrastructure program across the Country Regional Network.
Works are currently scheduled to commence on Thursday 29 April 2021 and are due to be completed on Wednesday 15 December 2021, subject to final approvals and weather conditions.
For further information visit: https://jhrcrn.com.au/who-we-are/country-regional-network-crn/latest-news/rail-overbridge-replacement-range-rd-mittagong/
Location: (-34.4512388, 150.4526885)
Water over road
Until further notice
Closed at: Approximately 1km north east of Golden Vale Road
Detours: Access to all properties on Oldbury Road is still available. Addresses South West of Medway Rivulet – access from Golden Vale Road. Addresses north east of Medway Rivulet – access from Illawarra Highway.
Location: (-34.5297993, 150.3051913)
1 km west of the Goodman’s Ford bridge to Tallygang Mountain Road.
20 September 2021 until mid-May 2022
Road reconstruction works.
Access for residents and emergency vehicles will be maintained and access will be available for residents at weekends from either Taralga or Mittagong but through traffic will not be allowed.
Please call 02 9898 9998 for details.
Access to the caves only via Taralga Road from Goulburn.
Location: (-34.2996001, 150.0354016)
Linemarking (night works)
March 2022
Roads and footpaths will be under traffic control. Detours will be in place during the works. Road users are cautioned to follow the changed traffic condition, exercise care when travelling near the work zone and be aware of heavy machinery.
Location: (-34.4044156, 150.5054169)
Road repairs/causeway construction
Ongoing
Worksites in this section are closed to all traffic. No access between Mittagong and Wombeyan Caves is available via Wombeyan Caves Road. Please note that the Wollondilly Rover Station Campsite is still open and accessible from Mittagong. Local residents in the closed section are updated with latest detour details.
Location: (-34.3009385, 149.9912797)
Road repairs/causeway construction
Ongoing
Worksites in this section are closed to all traffic. No access between Mittagong and Wombeyan Caves is available via Wombeyan Caves Road. Please note that the Wollondilly River Station Campsite is still open and accessible from Mittagong. Local residents in the closed section are updated with latest detour details.
Location: (-34.3017082, 149.9924844)
Kerb & gutter work
February
Roads and footpaths will be under traffic control. Detours will be in place during the works. Road users are cautioned to follow the changed traffic condition, exercise care when travelling near the work zone and be aware of heavy machinery
Location: (-34.5538424, 150.3685559)
Pavement Repair Work
February
Road will be under traffic control. Detours will be in place during the works. Road users are cautioned to follow the changed traffic condition, exercise care when travelling near the work zone and be aware of heavy machinery
Location: (-34.5777653, 150.3668755)
Footpath
March
Roads and footpaths will be under traffic control. Detours will be in place during the works. Road users are cautioned to follow the changed traffic condition, exercise care when travelling near the work zone and be aware of heavy machinery
Location: (-34.3988088, 150.4867885)
(Between Ivy Street & Pine Street)
Drainage Works
July
Roads and footpaths will be under traffic control. Detours will be in place during the works. Road users are cautioned to follow the changed traffic condition, exercise care when travelling near the work zone and be aware of heavy machinery
Location: (-34.4032076, 150.4843673)
Road widening and resurfacing
August
Roads and footpaths will be under traffic control. Detours will be in place during the works. Road users are cautioned to follow the changed traffic condition, exercise care when travelling near the work zone and be aware of heavy machinery.
Location: (-34.5101327, 150.4129828)
Footpath Extension
March
Roads and footpaths will be under traffic control. Detours will be in place during the works. Road users are cautioned to follow the changed traffic condition, exercise care when travelling near the work zone and be aware of heavy machinery.
Location: (-34.6719079, 150.213223)
Gravel Re-Sheeting
March
Roads and footpaths will be under traffic control. Detours will be in place during the works. Road users are cautioned to follow the changed traffic condition, exercise care when travelling near the work zone and be aware of heavy machinery
Location: (-34.5781659, 150.4595073)
Drainage
March
Roads and footpaths will be under traffic control. Detours will be in place during the works. Road users are cautioned to follow the changed traffic condition, exercise care when travelling near the work zone and be aware of heavy machinery
Location: (-34.550311, 150.3622678)
Shoulder Widening
July
Roads and footpaths will be under traffic control. Detours will be in place during the works. Road users are cautioned to follow the changed traffic condition, exercise care when travelling near the work zone and be aware of heavy machinery
Location: (-34.4571889, 150.3839348)
Bowral Memorial Hall is a building of significant importance to Council, Stakeholders/User Groups and the Public which utilise the facility as a fit for purpose multi-use asset. The refurbishment aims to support Council in meeting its obligations to the community by providing a contemporary environment to serve all.
The proposed internal alterations include:
* Converting the existing partitioned office spaces on the ground floor of the School of Arts wing into a more open main foyer with associated booking office, cloak room, bar and kitchen facilities.
* Provision of a lift to provide universal access to the first floor of the School of Arts building.
Alterations to the toilet amenities to improve functionality.
* The rebuilding of the floor of the hall to rectify the structural problems and provide compliance with current entertainment venue loading requirements.
* The rebuilding of the roof framing of the hall to rectify its marginal structural adequacy and allow for the installation of air conditioning and the ability to support modern entertainment venue lighting. The ceiling level will also be raised to provide more volume to the auditorium and thus enhance the space’s acoustic qualities for unamplified music.
* The provision of a bank of retractable seating to provide flexibility of seating options with enhanced sight (and sound) lines to the stage area.
* Replacing the existing wall linings with new more fire-resistant materials that will also improve the room’s acoustics for non-amplified sound.
* The provision of a forestage lift providing improved spatial flexibility and operational adaptability. The lift can be at stage level – providing a larger platform for performances, at main floor level or at a sunken level providing an orchestra pit or access to the basement level storage facilities.
* Adjustments to the stage proscenium to improve unamplified sound reflectivity into the main auditorium.
* The provision of an operable wall to close off the stage enhancing unamplified sound reflectivity back into the main body of the auditorium and closing off the back stage to act as an overflow Green Room.
* Removal of high-level cat walks to the back of stage area as they are no longer required for drama productions.
* Provision of a plant room to some of the current back stage ceiling void. This will house most of the plant for the new auditorium air conditioning system.
* Minor reconfigurations and refurbishment to the basement change rooms to improve functionality and fire separation from the floor above.
Location: (-34.4799005, 150.4202493)
Council has engaged contractors DSA Contracting to construct Stage 1a of the Bong Bong Masterplan these works include:
• Construction of a new formal asphalt Carpark
• Tree Removal (approx. 20 pine trees) and Replacement plantings (approx. 20 exotic and natives)
• Relocation of Obelisk to more prominent location with pathways and grouped seating
• Interpretive and wayfinding signage and maps
Project update:
Works have begun with a comprehensive Archaeological Assessment and investigation of the site currently being undertaken by DSA Contracting, Council staff and Heritage NSW.
These investigations are ongoing and are scheduled to conclude early August, once concluded onsite construction works can commence.
Impending Closure of Carpark off Moss Vale Road, sections of the Park.
During these investigation works, the carpark and access to the walking track for the public will be maintained.
Once construction activities onsite commence there will be a need to close the area for the safety of the public and construction workers, a further update will be released on this matter.
Location: (-34.5313506, 150.3931859)
Council is proposing to install a new 450mm diameter watermain along the verge of Old South Road between Kangaloon Road and Emily Circuit. This will improve the security of water supply into Bowral by providing a secondary link between Wingecarribee Water Treatment Plant and Water Reservoirs within the Bowral township.
Temporary Closure of the Shared User Path
During the works, as the worksite moves along the pipeline alignment, various portions of the shared user path will be impacted upon. Some sections of the concrete pathway will need to be removed and replaced to allow the pipeline to be installed. During these times temporary pedestrian access will be provided around the active worksite. Construction works are expected to begin August 2021 with completion December 2021 subject to weather conditions.
Location: (-34.4964406, 150.4331703)
We're working on the design for Moss Vale Bypass!!
Wingecarribee Shire Council has received $2.4 million from the NSW Government to conduct preliminary investigations and designs for the Moss Vale Bypass.
This design will include the necessary elements to properly inform the construction phase for a 3 stage delivery and allow detailed cost estimates to be prepared. Once the project is designed and properly costed, Council will work with the NSW Government (and others) to identify possible funding options in order to move ahead with the construction.
Work has commenced to complete the Concept Design for all three stages of the Bypass based on a detailed site survey, geotechnical investigation and service searches. This phase also includes the detailed design for Stage 1 which is between Beaconsfield Road and Suttor Road including a connection to Lackey Road and a bridge over the Main Southern Railway.
The Bypass would assist motorists travelling through Moss Vale by providing an alternative to Argyle Street. The Bypass includes an additional crossing of the Main Southern railway and critically, one which is not subject to flooding or height restrictions.
Location: (-34.536106, 150.3773119)
The installation of subsoil drains on the road shoulder will take place on Old South Road between Merrigang Street and Range Road. Traffic control will be in place during the works. Works are due to commence Monday 11 October 2021 to 12 November 2021 (weather permitting).
Location: (-34.474323, 150.4519023)
Contractor: Quickway Constructions
Upgrade to Frankland Street Sewer Pumping Station (MT7) and Rising Main Alignment
Location: (-34.4457279, 150.4344302)
Contractor: Gongues
Upgrade to Mansfield Road Sewer Pumping Station BW16(E5) and Rising Main Alignment
Location: (-34.4922813, 150.4557602)
Contractor: Stefanutti
Resealing of the road approaches to both bridges.
Works are scheduled November 2021
Location: (-34.4897828, 150.4106726)
Contractor: Stefanutti
Drain clearing and pavement sealing will be taking place from end October to November 2021
Location: (-34.5930714, 150.6502898)
The Church Road Oval Play Space is nearing the final stage of design with community consultation to be invited shortly. The play space will see a fresh modern design with new equipment replacing the existing.
Location: (-34.5483254, 150.3901052)
The Cook Street Play Space is nearing the final stage of design with community consultation to be invited shortly. The play space will see a fresh modern design with new equipment replacing the existing.
Location: (-34.4481908, 150.4291312)
Date | Observation |
---|---|
No valid readings reported |
Location: (-34.5845, 150.5926)
Date | Observation |
---|---|
No valid readings reported |
Location: (-34.4869, 150.4019)
Date | Observation |
---|---|
04/12/2024 2:15:00 am | -2.135 metres |
04/12/2024 2:00:00 am | -2.135 metres |
04/12/2024 1:45:00 am | -2.132 metres |
04/12/2024 1:30:00 am | -2.134 metres |
04/12/2024 1:15:00 am | -2.136 metres |
04/12/2024 1:00:00 am | -2.136 metres |
04/12/2024 12:45:00 am | -2.137 metres |
04/12/2024 12:30:00 am | -2.132 metres |
04/12/2024 12:15:00 am | -2.135 metres |
04/12/2024 12:00:00 am | -2.134 metres |
Location: (-34.3383, 150.745)
Date | Observation |
---|---|
No valid readings reported |
Location: (-34.3383, 150.6133)
Date | Observation |
---|---|
No valid readings reported |
Location: (-34.4167, 150.1967)
Date | Observation |
---|---|
04/12/2024 1:00:00 am | 0 mm |
Location: (-34.5858, 150.6264)
Date | Observation |
---|---|
04/12/2024 3:00:00 am | 0 mm |
04/12/2024 2:00:00 am | 0 mm |
04/12/2024 1:00:00 am | 0 mm |
Location: (-34.5253, 150.4217)
Date | Observation |
---|---|
No valid readings reported |
Location: (-34.6625, 150.4333)
Date | Observation |
---|---|
04/12/2024 1:00:00 am | 0 mm |
Location: (-34.4875, 150.4014)
Date | Observation |
---|---|
04/12/2024 3:00:00 am | 0 mm |
04/12/2024 2:00:00 am | 0 mm |
04/12/2024 1:00:00 am | 0 mm |
Location: (-34.3335, 150.267)
Date | Observation |
---|---|
No valid readings reported |
Location: (-34.3, 150.4167)
Date | Observation |
---|---|
No valid readings reported |
Location: (-34.4833, 150.5333)
Date | Observation |
---|---|
No valid readings reported |
Location: (-34.55, 150.5833)
Date | Observation |
---|---|
No valid readings reported |
Location: (-34.6167, 150.3833)
Date | Observation |
---|---|
No valid readings reported |
Location: (-34.65, 150.4833)
Date | Observation |
---|---|
04/12/2024 2:00:00 am | -1.058 metres |
04/12/2024 1:45:00 am | -1.055 metres |
04/12/2024 1:30:00 am | -1.056 metres |
04/12/2024 1:15:00 am | -1.055 metres |
04/12/2024 1:00:00 am | -1.063 metres |
04/12/2024 12:45:00 am | -1.055 metres |
04/12/2024 12:30:00 am | -1.055 metres |
04/12/2024 12:15:00 am | -1.058 metres |
04/12/2024 12:00:00 am | -1.054 metres |
03/12/2024 11:45:00 pm | -1.057 metres |
03/12/2024 11:30:00 pm | -1.059 metres |
03/12/2024 11:15:00 pm | -1.056 metres |
Location: (-34.3517, 150.6417)
Date | Observation |
---|---|
No valid readings reported |
Location: (-34.24, 150.2533)
Date | Observation |
---|---|
No valid readings reported |
Location: (-34.5369, 150.3825)
Date | Observation |
---|---|
04/12/2024 2:00:00 am | 0 mm |
04/12/2024 1:00:00 am | 0 mm |
Location: (-34.3711, 150.3346)
Date | Observation |
---|---|
No valid readings reported |
Location: (-34.3728, 150.6103)
Date | Observation |
---|---|
04/12/2024 1:00:00 am | 0 mm |
Location: (-34.57, 150.6464)
Date | Observation |
---|---|
04/12/2024 2:30:00 am | 10.078 metres |
04/12/2024 2:15:00 am | 10.077 metres |
04/12/2024 2:00:00 am | 10.076 metres |
04/12/2024 1:45:00 am | 10.079 metres |
04/12/2024 1:30:00 am | 10.078 metres |
04/12/2024 1:15:00 am | 10.076 metres |
04/12/2024 1:00:00 am | 10.079 metres |
04/12/2024 12:45:00 am | 10.078 metres |
04/12/2024 12:30:00 am | 10.077 metres |
04/12/2024 12:15:00 am | 10.079 metres |
04/12/2024 12:00:00 am | 10.078 metres |
Location: (-34.3272, 150.6311)
Date | Observation |
---|---|
04/12/2024 2:30:00 am | 1.07 metres |
04/12/2024 2:15:00 am | 1.071 metres |
04/12/2024 2:00:00 am | 1.07 metres |
04/12/2024 1:45:00 am | 1.071 metres |
04/12/2024 1:30:00 am | 1.071 metres |
04/12/2024 1:15:00 am | 1.07 metres |
04/12/2024 1:00:00 am | 1.071 metres |
04/12/2024 12:45:00 am | 1.07 metres |
04/12/2024 12:30:00 am | 1.07 metres |
04/12/2024 12:15:00 am | 1.07 metres |
04/12/2024 12:00:00 am | 1.069 metres |
03/12/2024 11:45:00 pm | 1.069 metres |
Location: (-34.4969, 150.3436)
Date | Observation |
---|---|
No valid readings reported |
Location: (-34.5756, 150.5183)
Date | Observation |
---|---|
04/12/2024 2:15:00 am | 0.505 metres |
04/12/2024 2:00:00 am | 0.509 metres |
04/12/2024 1:45:00 am | 0.512 metres |
04/12/2024 1:30:00 am | 0.515 metres |
04/12/2024 1:15:00 am | 0.519 metres |
04/12/2024 1:00:00 am | 0.52 metres |
04/12/2024 12:45:00 am | 0.523 metres |
04/12/2024 12:30:00 am | 0.524 metres |
04/12/2024 12:15:00 am | 0.528 metres |
04/12/2024 12:00:00 am | 0.529 metres |
03/12/2024 11:45:00 pm | 0.532 metres |
Location: (-34.5373, 150.4808)
Date | Observation |
---|---|
04/12/2024 2:15:00 am | 0.681 metres |
04/12/2024 2:00:00 am | 0.683 metres |
04/12/2024 1:45:00 am | 0.683 metres |
04/12/2024 1:30:00 am | 0.684 metres |
04/12/2024 1:15:00 am | 0.684 metres |
04/12/2024 1:00:00 am | 0.685 metres |
04/12/2024 12:45:00 am | 0.685 metres |
04/12/2024 12:30:00 am | 0.687 metres |
04/12/2024 12:15:00 am | 0.687 metres |
04/12/2024 12:00:00 am | 0.688 metres |
Location: (-34.3906, 150.4253)
Date | Observation |
---|---|
No valid readings reported |
Location: (-34.5608, 150.1625)
Date | Observation |
---|---|
04/12/2024 2:00:00 am | 0.263 metres |
04/12/2024 1:45:00 am | 0.263 metres |
04/12/2024 1:30:00 am | 0.263 metres |
04/12/2024 1:15:00 am | 0.264 metres |
04/12/2024 1:00:00 am | 0.263 metres |
04/12/2024 12:45:00 am | 0.263 metres |
04/12/2024 12:30:00 am | 0.263 metres |
04/12/2024 12:15:00 am | 0.263 metres |
04/12/2024 12:00:00 am | 0.264 metres |
03/12/2024 11:45:00 pm | 0.264 metres |
03/12/2024 11:30:00 pm | 0.263 metres |
03/12/2024 11:15:00 pm | 0.263 metres |
03/12/2024 11:00:00 pm | 0.263 metres |
03/12/2024 10:45:00 pm | 0.263 metres |
03/12/2024 10:30:00 pm | 0.263 metres |
03/12/2024 10:15:00 pm | 0.264 metres |
03/12/2024 10:00:00 pm | 0.264 metres |
03/12/2024 9:45:00 pm | 0.264 metres |
03/12/2024 9:30:00 pm | 0.265 metres |
03/12/2024 9:15:00 pm | 0.264 metres |
03/12/2024 9:00:00 pm | 0.264 metres |
03/12/2024 8:45:00 pm | 0.265 metres |
03/12/2024 8:30:00 pm | 0.265 metres |
03/12/2024 8:15:00 pm | 0.264 metres |
03/12/2024 8:00:00 pm | 0.264 metres |
03/12/2024 7:45:00 pm | 0.265 metres |
03/12/2024 7:30:00 pm | 0.265 metres |
03/12/2024 7:15:00 pm | 0.265 metres |
03/12/2024 7:00:00 pm | 0.264 metres |
Location: (-34.5347, 150.3969)
No Water Outages to display
Data Authorities: Rural Fire Service NSW (RFS) , State Emergency Service NSW (SES) , Manly Hydraulics Laboratory (MHL) , Transport NSW , Jemena , Geoscience Australia , NSW Department of Planning, Industry and Environment (DPIE) , SharkSmart , Essential Energy
Checked a few seconds ago
Social Media
Weather Forecast
Today
Cloudy.
Rainfall 30%
Wed, Dec 4
Partly cloudy.
Rainfall 10%
Thu, Dec 5
Possible shower.
Rainfall 40%
Fri, Dec 6
Shower or two.
Rainfall 70%
Sat, Dec 7
Shower or two.
Rainfall 70%
Sun, Dec 8
Shower or two.
Rainfall 50%
Mon, Dec 9
Possible shower.
Rainfall 40%
Scroll right for more
Data Authority: Bureau of Meteorology (BOM)
Checked 22 minutes ago